HELP
When you call us, here’s what we may ask you:
- What are the technical requirements? (kW, voltage, phase, frequency, power factor, etc.)
- What is the testing duration and testing sequence?
- What type of equipment will be tested? (application)
- Who will be performing the tests?
- How will heat be dissipated? (vertical or horizontal)
- What is the total distance between the equipment to be tested and the load banks?
- Where will the units be delivered?
- Do you need help with system design or operation?
- What is the expected rental period? (daily, weekly, monthly)
- What date will you require the load banks on site?
Call 877.288.4482 to talk to one of our solution experts. If you prefer, you may answer these questions on our printable
Technical Requirements PDF Form and submit it to us.
Helpful Power Conversions and Electrical Terminology
kW: Kilo Watts
kW = kVA x pf
kVA: Kilo Volt Amperes
pf: Power Factor
kVAR: Kilo Volt Amperes Reactive
kVAR = √(kVA2—kW2)
Amperes (Resistive) Per Phase
Amps = (kWx1000)/ (E x √3)
Amperes (Reactive) Per Phase
Amps = (kVAR x 577)/E
3Ø Voltage Derating: Applied Voltage2 / Rated Voltage2 = D
D x Rated Capacity = Reduced Rating
1Ø & DC Voltage Derating: Applied Voltage / Rated Voltage = D
D x Rated Capacity = Reduced Rating
For assistance on calculating your load requirements, call one of our Load Bank Specialists at 877.288.4482.